So pretty much 99% completed a series of workers shacks to go on the layout. These shacks will be placed in out of the way places along the railway line or along the creek bed amongst the trees and scrub. Then some rudimentary walking paths will join the shacks up with roads or routes to the timber and/or flour mill.
|
First shack. Love the green mouldy look and the bowed roof.
|
|
Corrugated iron roof. |
|
Scratched the timber with a wire brush. |
|
Tar paper roof. Patched roof on outbuilding. |
|
My favourite. Really went to town with weathering on this one to make it look really run down like some old drunk lives in it. Hope to surround it with junk including a couple of dogs on chains living in old tins or logs. |
Comments